Work & Impact

Evidence in action. From research to resilience — the projects, partnerships and outcomes that demonstrate what is possible when knowledge meets practice.

Founding project examples

These real-world projects — delivered by Alison in collaboration with others — demonstrate the kind of evidence-led, collaborative environmental practice that WeKnowWhatWorks.Net exists to champion and scale.

South West Water Clean Sweep
Water & Coastal

South West Water

·

Cornwall

South West Water Clean Sweep

Clean Sweep was a £1.5 billion programme to transform bathing waters and the sewerage network across the South West — the largest environmental programme of its kind in Europe. Working as Environmental Project Manager during the planning stages of wastewater treatment schemes across Cornwall, including Portscatho, Boscastle, Tintagel, Sennen and Porthcurno. Schemes included wastewater treatment works, pipelines and pumping stations — all within the Cornwall Area of Outstanding Natural Beauty.

What worked

Close collaboration between client, engineers, environmental specialists, landowners and local communities. Rigorous planning applications and Environmental Statements. Regular public consultation. Multidisciplinary teamwork across landscape, ecology, archaeology, noise and odour disciplines.

£1.5bn

programme investment

Largest

environmental programme of its kind in Europe

Multiple

schemes delivered in sensitive locations

Tintagel Castle Footbridge
Heritage & Infrastructure

English Heritage

·

Tintagel, Cornwall

Tintagel Castle Footbridge

Coordination of the Environmental Impact Assessment and preparation of the Environmental Statement for the award-winning footbridge and associated landscape improvements at Tintagel Castle — a site within the Cornwall AONB, a Scheduled Monument, a Special Area of Conservation and a Site of Special Scientific Interest. The scheme was developed through collaboration of architects, structural engineers, ecologists, landscape architects, archaeologists and other technical specialists.

What worked

Multidisciplinary collaboration from the outset. Thorough EIA process that identified and resolved environmental constraints early. Shared vision between heritage, engineering and environmental teams. The result: a world-class piece of infrastructure that enhances rather than harms its extraordinary setting.

ICE

South West Civil Engineering Showcase Award 2020

Museum+

Permanent Exhibition of the Year 2020

RIBA

South West Regional Award 2021

Wytch Farm Oilfield Environmental Management
Landscape & Biodiversity

Perenco (UK) Ltd / BP

·

Dorset

Wytch Farm Oilfield Environmental Management

Environmental Project Manager for a range of schemes at the Wytch Farm, Wareham and Kimmeridge oilfields — located within the Dorset AONB, Purbeck Heritage Coast, Special Areas of Conservation, Special Protection Areas, Ramsar sites and SSSIs. Coordinated a complex Environmental Statement accompanying 39 planning applications to extend the operational life of the oilfields through to 2037. This work directly led to the creation of the Wytch Farm Landscape and Access Enhancement Fund.

What worked

Detailed environmental assessment — EIA and Habitat Regulations Assessment — combined with genuine commitment to landscape enhancement. The Landscape and Access Enhancement Fund, supported by Dorset AONB, Dorset Council and Natural England, demonstrates how industrial operations can generate lasting environmental benefit when evidence and collaboration drive decision-making.

39

planning applications coordinated

Funding

secured

Access

enhanced

Avon WTW Support Scheme
Water Infrastructure

South West Water

·

South Hams & Dartmoor, Devon

Avon WTW Support Scheme

Environmental Project Manager during the planning and design phase of an £8.8 million, 13-kilometre trunk main pipeline to improve water supply security for the South Hams and Plymouth area. Part of the scheme ran through Dartmoor National Park. Environmental impacts were minimised through close liaison between client, engineers and the environmental team — covering watercourse crossings, woodland, a Scheduled Monument and sensitive countryside.

What worked

Early environmental screening confirmed the scheme did not require a full planning application — saving time and cost while maintaining rigorous environmental standards through a detailed Construction Environmental Management Plan. Demonstrates how proportionate, evidence-based assessment enables infrastructure delivery without compromising environmental integrity.

£8.8M

scheme value

13km

pipeline through sensitive landscape

CIWEM

World of Difference Award — Highly Commended

The evidence base

Our work is grounded in a growing body of evidence about what works in climate resilience — synthesised, translated and made accessible for practitioners, policymakers and communities.

Systematic reviews

Rigorous synthesis of the best available evidence on specific resilience interventions and approaches.

Practice guides

Accessible, actionable guidance translating research into practical tools for decision-makers.

Evaluation frameworks

Methods and tools for assessing the effectiveness of resilience interventions in practice.

Case study library

A growing collection of documented examples from across the UK — what was done, what worked, and why.

Share your experience

Have you implemented a climate resilience project? We want to hear from you. Your experience is evidence — and it could help others across the UK.